Project · Industrial building extension · Gualba (Barcelona)
Extending an industrial building in Gualba for a new boiler

The extension, with reinforced concrete walls.
90 m²
Area
Building extension.
€75,000
Construction budget
Structure and services.
Concrete
Walls
Designed to withstand an explosion.
Metal
Roof
Light sheet roofing.
The brief
A safe space for a boiler
The building is part of an industrial plant dedicated to solvent recycling. The aim was to extend it to house a new boiler.
Project data
The building
Walls that protect
Reinforced concrete and a metal roof.
The walls are reinforced concrete for safety reasons: if the boiler failed and exploded, they must be able to withstand it. The roof is metal sheeting on a steel structure, a robust, practical solution for this kind of facility.
Frequently asked questions
Industrial buildings and extensions
Related















