Project · Change of use without building work · Sant Martí (Barcelona)
Converting premises into a home without building work: a real case on Carrer Aragó
Before you read on
Today this change of use could not be done without building work
Two key things have changed since 2013: the Spanish Technical Building Code now requires the building envelope and services to be upgraded in any change of use to residential, and since 2022 Barcelona has calculated housing density with a different criterion. Under current regulations, converting commercial premises into a home usually means a full refurbishment. We explain it below.
The brief
Legalising a home that already existed
Since 1996 the owner had been living in a first-floor unit of a residential building on Carrer Aragó. In the Land Registry and the Cadastre it was registered as an office, and he wanted to convert it legally into a home so that he could sell or let it as such.
The first step was a feasibility study: we checked that planning rules allowed one more dwelling in the building, found the original project in the municipal archive and surveyed the unit to verify that, as it stood, it met the habitability and accessibility requirements.
Project details
Before
An open-plan office in a residential building
The unit before the change of use.
The unit was an open-plan space of about 50 m² usable floor area, with two windows onto the street, a full bathroom and a kitchen. A timber platform raised part of the floor.
The original plan of the building, which we found in the municipal archive, showed that the layout was the original one and that the office had the floor area needed to become a home.
The solution
Furniture instead of partitions
A single space with a bathroom, in legal terms.
A bedroom separated by furniture
Legally, the home is registered as a single space with a bathroom. To furnish it as a one-bedroom home we proposed a separation made with furniture: a tall wardrobe facing the corridor and a low unit facing the living room.
The low unit lets light and air through from the windows, so both the living room and the sleeping area meet the natural lighting and ventilation requirements set by the regulations.
The only work: the bathroom door
All we had to do was reverse the opening direction of the bathroom door. With the door opening outwards, the 1.20 m diameter circle required by the regulations can be inscribed inside, so the bathroom is wheelchair-accessible.
This met the accessibility requirements for the home without touching partitions, services or finishes, so the owner could keep living in the home while the change of use was being processed.
Plans
How we justified a bedroom that does not exist
Initial state, proposal and regulatory justification.
Even though the proposal has no enclosed bedroom, the regulations require proof that one could be built. Decree 141/2012 on habitability states that, when a home is a single space, it must be possible to partition off an 8 m² bedroom without either the living room or the bedroom losing their mandatory requirements. This has to be justified on plans, just as if the partition were going to be built.
That is why the third plan shows a theoretical partition with a diagonal section. The angle is not an aesthetic choice: it is how every room meets both Decree 141/2012 and the Metropolitan Building Ordinances at the same time. The circles drawn are precisely that check, and the change of use was approved without building the partition.
What the theoretical partition had to achieve
What has changed
Why it could not be done without building work today
The Building Code and the density criterion.
1. The Building Code requires the home to be upgraded
In 2013, the Spanish Technical Building Code (CTE) only required compliance with its energy-saving (DB HE) and noise-protection (DB HR) requirements when building work altered the premises. Since neither the envelope nor the services were touched here, it was enough to justify the safety, health, habitability and accessibility conditions of the home as it stood.
The 2019 update of the CTE (Royal Decree 732/2019) changed this. Today DB HE 1 applies to every change of use, even if no other work is carried out: the home must meet the thermal transmittance limits for façades, windows and party walls, and a global heat-transfer coefficient specific to changes of use. If it exceeds 50 m² of usable floor area, it must also comply with DB HE 0 on energy consumption.
2. Barcelona calculates density differently
To create a new dwelling, a building cannot exceed the maximum number of dwellings allowed by planning rules. In most of Barcelona, that maximum is obtained by dividing the floor area by a module of 80 m².
In 2013 the calculation was based on the building’s actual built floor area. In this case, 2,233 m² of floor area allowed 28 dwellings, and the building had 22, so there was room for the new one.
In July 2022 Barcelona City Council published a guide that changed the criterion: density is now calculated on the floor area that current planning allows to be built, not on the area actually built. In many older buildings, built with more floor area than is permitted today, this reduces the number of dwellings allowed, and often there is no room left for any more. That is why it is the first thing we check.
3. Further requirements on top
On top of these come the health requirements of DB HS (ventilation of the home and, in areas where it applies, radon protection), the accessibility requirements of the new Catalan Accessibility Code (Decree 209/2023) and the recommendation to comply with DB HR on noise protection in changes of use to residential.
In practice, almost no commercial unit meets all of this without insulating the envelope, replacing the windows and renewing the ventilation and air-conditioning systems. The usual outcome is a full refurbishment, which is worth factoring in from the start when assessing a purchase.
Beware of premises “with the work already done”
Premises are often advertised as already refurbished into a home where “only the change-of-use paperwork is missing”. If that work was done without a permit or a project, it most likely does not comply with the current CTE and cannot be legalised as it stands, or the building may no longer allow more dwellings because of density. Much of the work may need to be redone.
Before buying or signing a reservation, commission a change-of-use feasibility study: we will tell you whether it is possible, what work is needed and its approximate cost.
Frequently asked questions
Change of use from premises to a home without building work
Related